Before the job is to deal with attached vibrator to inspect and test vibration test vibration shall not be carried out on the hard
Electric attachment, electric flat-plate vibrator, attachment style, flat-plate vibrator bearings should not bear the axial force, when used, the motor shaft should be kept horizontal.When used, leads to the cable may not get pulled, but not breaking. Operations, leakage protection and grounding of electrical equipment or access to zero device should be readily observed and confirmed eligible. When the discontinuity of the maintenance operations, disconnect the power.An China Plastic Pet Molds electric plug-in vibrator.The plug-in vibrator motor power, you should install leakage concrete vibrator protection device should be safe and reliable ground or zero.Flat-plate vibrator operation, should the plate and concrete to keep in touch, Discovering tap concrete until the surface of the paddle, you can no longer sink slowly move forward, move the speed should be able to to ensure that concrete tap the paddle.The components of the device vibrator template shall be sturdy and reliable, its size should be compatible with the vibrator rated vibration area.
Vibration electric concrete vibrator shall not be set aside has condensate or initial setting of concrete,a template at the same time using multiple attachment vibrator, vibrator frequency should be consistent with the relative surface of the vibrator should be staggered to install.The job is completed and should be motor, hose, vibrator clean up clean, and should be the requirements to carry out maintenance operations,the operator shall be subject to electricity education, the job should wear insulated rubber boots and insulated gloves.The vibrator shall not be in the initial setting of concrete, flooring, scaffolding and hard, dry ground test vibration. Mixing plant hopper vibrator, the placement of the rubber pad.
Operation, the vibrator hose bend radius shall be not less than 500mm, and not more than two bends, the operation should the vibrator vertical deep into the concrete, shall not be forced hard plug, oblique push or let reinforced grip spare the rod, but also may not all inserted into the concrete, the insertion depth should not exceed 3/4 of the rods should not touch the steel core tube and embedded parts. Foot bolts should be tightened, and the tightness of the bolts should be consistent. Shall not use hoses to drag motor.Before the job is to deal with attached vibrator to inspect and test vibration test vibration shall not be carried out on the hard, dry soil or hard objects.Vibrator hose must not be broken when the hose used for a long time so that the length of growth, should be promptly repaired or replaced.The cable should meet the necessary length cable line shall not heap pressure of the goods or the vehicles are squeezed, is strictly prohibited electric cable dragging or hanging vibrator.
The operations stop when you need to move the vibrator should be closed to motor, and then cut off the power.Before use, you should check the ministries and confirm that connections are secure, correct direction of rotation.When installed, the location of the vibrator baseplate mounting holes should be correct, should prevent the foot bolts the skew leaving the enclosure damaged.Vibrator store shall not heap pressure hose should be straight away, and respond to the motor to take moisture measures.Attached to the vibrator installed in the concrete form work, each vibration time should not exceed 1min, the concrete in the mold pan-plasma flow or horizontal like to stop vibration, not real in the state of the initial setting of concrete vibration and then.